Featured

Construction Delay Analysis

Recorded Delay Analysis Course

  • Understand the delay definition and delay contribution;
  • Understand the concurrency definition;
  • Understand the classification of the different methods of delay analysis (RP 29, 03 - AACEI);
  • Differentiate between prospective and retrospective approaches;
  • Understand by practicing the main methods implemented for delay analysis; 
  • Understand the limitation, advantages and disadvantages of each method; and
  • Practice different cases studies.
  • Understand the delay definition and delay contribution;
  • Understand the concurrency definition;
  • Understand the classification of the different methods of delay analysis (RP 29, 03 - AACEI);
  • Differentiate between prospective and retrospective approaches;
  • Understand by practicing the main methods implemented for delay analysis;
  • Understand the limitation, advantages and disadvantages of each method; and
  • Practice different cases studies.

  • Planning and Scheduling;
  • Primavera P6 (Attendees are kindly requested to have their laptops with Primavera P6).

  • Planning Engineers;
  • Senior Planning Engineers;
  • Planning Managers;
  • Delay Analysts;
  • Claim Specialist;
  • Contract Administrator; and
  • Every one who needs to enhance his skills in “Delay Analysis”.

  • Recorded Videos.
  • Sessions' Presentation.
  • Xers, Excels, Word, pdfs, ...etc.
  • Workshops' files.
  • Supporting Documents.
Day Date Session no. Topics
Fri 31, Mar 2023 1

Opening Statements, Training Outline, Construction talks, Introduction to Delay Analysis and Definition of Forensic Planning.


Wed 05, Apr 2023 2

Delay analysis important Terminologies, Training References and delay analysis methods categorization in accordance with Training content.

Wed 05, Apr 2023 3

In this session Eng. Ahmed Afifi will cover Contractual Basis for Extension of Time (EOT)

Sat 08, Apr 2023 4

Delay types definition, Delays measuring cycle and Schedule Types in accordance with delay analysis principles (Baseline, As-Built and Update)


Sat 08, Apr 2023 5

Longest Path versus Negative Float theory and Retrospective Analysis Methods and their Implementation (1)

Sat 08, Apr 2023 6

Bonus Session | New and Advanced Technique for the implementation of MIP3.4

1. Implementing Time Impact Analyses on Large, Complex EPC Projects

Sat 08, Apr 2023 7

Retrospective Analysis Methods and their Implementation (2)

Sat 08, Apr 2023 8

Prospective Analysis (Time Impact Analysis (TIA)). Following RP52,R06. One Method 


Wed 31, May 2023 9
Sat 21, Dec 2024 10

Bonus Session | Practical Real Examples on MIP 3.3

Sun 22, Dec 2024 11

What a Delay Analyst Cannot Be Unaware Of (Can be extended for two sessions):-


  1. Disruption claims
  2. Apportionment concept and methods
  3. Claim document structure, writing and submission.
  4. Prolongation cost calculation

Watch the lectures from this YouTube link: What a Delay Analyst Cannot Be Unaware Of

Sun 29, Dec 2024 12

Construction Delay and Disruption Analysis - Q and A Session

Sat 17, Jan 2026 13

Opening Statements, Training Outline, Construction talks, Introduction to Delay Analysis and Definition of Forensic Planning.


Delay analysis important Terminologies, Training References and delay analysis methods categorization in accordance with Training content.

Delay types definition, Delays measuring cycle and Schedule Types in accordance with delay analysis principles (Baseline, As-Built and Update)


Prospective Analysis (Time Impact Analysis (TIA)). Following RP52,R06. One Method 


Longest Path versus Negative Float theory and Retrospective Analysis Methods and their Implementation (1)

Retrospective Analysis Methods and their Implementation (2)

In this session Eng. Ahmed Afifi will cover Contractual Basis for Extension of Time (EOT)

Bonus Session | New and Advanced Technique for the implementation of MIP3.4

1. Implementing Time Impact Analyses on Large, Complex EPC Projects

Bonus Session | Practical Real Examples on MIP 3.3

What a Delay Analyst Cannot Be Unaware Of (Can be extended for two sessions):-


  1. Disruption claims
  2. Apportionment concept and methods
  3. Claim document structure, writing and submission.
  4. Prolongation cost calculation

Watch the lectures from this YouTube link: What a Delay Analyst Cannot Be Unaware Of

Construction Delay and Disruption Analysis - Q and A Session

Reviews

5  

3

4  

0

3  

1

2  

0

1  

0

4.5

4 reviews

Mahmoud Amin

Testing

Mahmoud Abbas Makhlouf

teachcamp

edf

Yes, After completing the course you will receive a soft copy certificate

Yes you can use it as pdus, as the course certificate will contain the instructor pmp no.